From preparation to commissioning
- Design documentation and pretreatment
- Housings, equipment and initial media charge
- Pumps, pipework and instrumentation
- Installation, civil works and commissioning
- Standby capacity and automation

CAPEX is the initial investment; OPEX covers operating costs. System selection compares both over the same period.
Approximate baseline estimates for comparison. These are not a quotation, price list or guaranteed cost for your system.
Enter the initial investment (CAPEX) and total operating costs for all 10 years (OPEX). Total cost and cost per m³ update automatically.
| Technology | CAPEX (€) | OPEX, 10 years (€) | Total (€) | €/m³ |
|---|---|---|---|---|
| GAC | 3,000,000 | 0,285 | ||
| IEX | 2,420,000 | 0,230 | ||
| iA filter assemblies | 910,000 | 0,087 |
Cost per m³ = (CAPEX + ten-year OPEX) / water volume treated over 10 years.
Amounts are nominal, without discounting or indexation. The source material does not specify the tax basis. The calculation does not add VAT.
We prepare it based on flow, analyses, existing equipment and the required scope.
Send an enquiry