A mobile solution for pilot trials and temporary water treatment. From initial analysis to a filtration plan with local ECO ELEMENT support.

COMPACT. ADAPTABLE. ON SITE.

Mobile filtration
with a clear purpose.

iA – intelligent Absorber Technology by instrActionTECHNOLOGY
instrAction

The iA MTU is a mobile pilot system with approximately 1–2 m³/h flow for verifying the technology before designing a larger industrial installation.

The Euro-pallet unit is designed for rapid setup with limited additional infrastructure. It supports pilot projects, temporary treatment and technology validation at remote sites.

The filtration configuration is adapted to actual water composition and project requirements. The design provides easy filter access and replacement.

Enquire about the mobile unit
Visualisation of mobile filtration in an industrial setting
Visualisation of mobile filtration in an industrial setting.
WHAT THE MOBILE UNIT INCLUDES

Four BIG filters.
Two consecutive stages.

Prefiltration and measurements

Two sediment prefilters, internal pipework, shut-off and sampling valves, a pressure gauge and flow meter. A pump is included where needed.

4 × iA 20 P BIG

Two housings in the first filtration stage and two in the second. The consecutive arrangement allows monitoring of the first stage and additional treatment in the second.

Euro-pallet pilot system

A compact installation for temporary use. The quotation specifies the rental period and professional handling of spent PFAS-containing filters.

What do we want to verify? A flow of around 1 m³/h is usually sufficient to demonstrate operation. Assessing capacity and replacement frequency may require a longer trial or a smaller test filter; a 30-day pilot alone does not establish a one-year service life.
WHEN TO CHOOSE A MOBILE UNIT

Test first.
Then make an informed decision.

Pilot project

Verify the selected configuration on actual water before committing to a permanent system.

Temporary treatment

An option for projects that need filtration only for a limited period.

Industry and utilities

Working with industrial operators, municipalities and partners to evaluate the technology.

Checking the outlet flow of the iA MTU mobile unit
PERFORMANCE MONITORING

The data you need for the next step.

A pilot project should answer specific questions: what outlet quality is achieved, at which flow, and how performance changes over time.

We therefore include flow and pressure measurements and inlet and outlet sampling in the project plan. This provides a useful basis for selecting the next solution.

ECO ELEMENT · LOCAL SUPPORT

From analysis
to installation planning.

We adapt instrAction technology to project requirements and conditions at your site.

01 / YOUR WATER

Define the starting point

Describe your problem and tell us where water treatment is needed. Together, we will identify the information required and the next steps.

02 / CONFIGURATION

Select the configuration

We coordinate filtration, pretreatment and on-site connection requirements.

03 / TESTING

Set the criteria

We define target outlet quality, sampling, duration and monitoring in advance.

04 / NEXT STEPS

Evaluate the results

Project results inform the decision on further use or a permanent system.

The quotation specifies flow, scope of supply, schedule and spent-media handling. Filtration captures PFAS; their final treatment is a separate part of the plan.